How Much Does an Electrical Panel Upgrade Cost in London, Ontario?

A practical breakdown of panel replacement and 200A service upgrade pricing, what is included, and the site conditions that affect the final cost.

By Sebco Electric Ltd · Updated November 14, 2026 · 6 min read

Clean 200 amp electrical panel upgrade completed in London Ontario

The short answer

In London, Ontario, Sebco Electric panel changes start at $1,899 plus HST when the existing service capacity remains the same. A complete 100A-to-200A service upgrade starts at $2,199 plus HST and commonly ranges from about $2,200 to $3,500, depending on the existing equipment and utility requirements.

A panel change and a service upgrade are different projects. The right price begins with confirming whether you only need a modern breaker panel or additional electrical capacity for new loads.

What is included in a panel change?

A panel change replaces the existing breaker panel while keeping the home at its current service size, often 100A. This may be appropriate when the panel is obsolete, damaged, short on breaker spaces, or poorly organized but the available service capacity is still adequate.

The work normally includes transferring existing branch circuits, installing compatible breakers, checking grounding and bonding, organizing and labelling the circuits, coordinating the ESA notification and inspection, and testing the finished installation.

  • Sebco Electric starting price: $1,899 plus HST
  • Current service capacity remains unchanged
  • Modern panel and breakers replace aging equipment
  • ESA notification and inspection coordination are included in the quoted scope

What is included in a 200A service upgrade?

A 200A upgrade increases the total electrical capacity available to the home. Because the capacity changes, the project may extend beyond the panel to the meter base, service conductors, conduit, main equipment, grounding and bonding.

The incoming utility power must be disconnected while the service equipment is replaced. Sebco Electric coordinates this work with London Hydro or the applicable local utility, as well as the required ESA inspection and reconnection.

  • New 200A breaker panel and breakers
  • 200A-rated service conductors where required
  • Meter base and service conduit work where required
  • Grounding and bonding upgrades
  • Utility disconnect and reconnect coordination
  • Circuit transfer, labelling and final testing

What changes the final price?

Two homes that look similar from the street can require different service work. A licensed electrical assessment is the only reliable way to define the complete scope.

  • Condition and location of the existing panel
  • Number of circuits that must be transferred
  • Condition and rating of the meter base
  • Service conduit and conductor requirements
  • Grounding and bonding work
  • Access around finished walls, ceilings or utility equipment
  • Requirements from the local electrical utility

A clear quote should identify whether it covers a panel-only replacement or the complete service equipment needed for a 200A upgrade.

When is the added capacity worthwhile?

A 200A service is often considered when a home is adding several major electrical loads or when the existing 100A service is already heavily loaded. Common examples include a Level 2 EV charger, hot tub, electric sauna, heat pump, electric heating, basement apartment, workshop or home addition.

Not every new appliance requires a service upgrade. Sebco Electric can perform a load calculation or review available hydro demand data before recommending additional capacity.

Frequently asked questions

How long does a 200A service upgrade take?

Most straightforward residential 200A service upgrades are completed in one working day. The disconnect, electrical work, ESA inspection and utility reconnection are coordinated so power can typically be restored the same day.

Is the ESA inspection included?

Sebco Electric coordinates the required ESA notification and inspection for the electrical work included in the quoted scope.

Can I replace the panel without upgrading to 200A?

Yes. If the current service capacity is adequate and the remaining service equipment is suitable, the panel can often be replaced while the home remains on a 100A service.